亚洲人妻另类清纯_超碰在线观看永久_奇米网AV第四色_午夜AV影视大全_午夜AV影视大全_亚洲无码偷拍自拍_中文字幕一区二区三区熟女视频_日韩丝袜一区二区

濟(jì)南誠(chéng)耐金屬制品有限公司

濟(jì)南誠(chéng)耐金屬制品有限公司

不斷發(fā)展技術(shù)力量、完善的設(shè)計(jì)服務(wù)團(tuán)隊(duì),真誠(chéng)為您提供的服務(wù)

咨詢熱線
于經(jīng)理15194166167
15990909037

產(chǎn)品推薦

聯(lián)系我們

企業(yè)名稱:濟(jì)南誠(chéng)耐金屬制品有限公司

聯(lián)系人:于經(jīng)理

電話: 15990909037

電話: 15194166167

地址:山東省濟(jì)南市歷城區(qū)小清河南路8288號(hào)

當(dāng)前位置:首頁(yè) »資訊中心 » 新聞資訊

電梯門(mén)套工程安裝質(zhì)量要求

來(lái)源:http://www.kulg.cn/ 瀏覽:0發(fā)表時(shí)間:2022-07-11
1.為了保證企業(yè)的品牌,保證業(yè)主較高質(zhì)量要求,乙方在進(jìn)場(chǎng)后要認(rèn)真配合現(xiàn)場(chǎng)核對(duì)好尺寸,確認(rèn)好圖紙以便生產(chǎn),對(duì)進(jìn)場(chǎng)的成品材料要有程序的去安裝,小心堆放,如因乙方亂堆放造成板材破損,一切損失由乙方負(fù)責(zé)。
1. In order to ensure the brand of the enterprise and the high quality requirements of the owner, Party B should carefully cooperate with the site to check the size and confirm the drawings for production after entering the site. The finished materials entering the site should be installed in a programmed way and stacked carefully. If the plates are damaged due to Party B's random stacking, Party B should be responsible for all losses.
2.在安裝時(shí)要按照?qǐng)D紙(有編號(hào)的板材按編號(hào)安裝),特殊需要調(diào)整的板面由現(xiàn)場(chǎng)安裝人員自行調(diào)整后再安裝,對(duì)不能上墻的板面不要安裝,及時(shí)通知工廠再補(bǔ)。
2. During installation, the plates shall be installed according to the drawings (numbered plates shall be installed according to the number). The plates that need special adjustment shall be installed after being adjusted by the on-site installation personnel. The plates that cannot be installed on the wall shall not be installed, and the factory shall be notified in time to make up.
3.安裝時(shí)每個(gè)墻面的陽(yáng)角、橫豎縫、板面缺角、崩邊等要修補(bǔ)的石材,由安裝工自己在施工中及時(shí)修補(bǔ)好再安裝。每個(gè)墻面完工后,由現(xiàn)場(chǎng)主管檢查驗(yàn)收后,交項(xiàng)目部驗(yàn)收打包(屬于加工錯(cuò)誤,現(xiàn)場(chǎng)不能修補(bǔ)的由工廠派人員修理)。
3. During installation, the stone materials to be repaired, such as external corners, horizontal and vertical joints, missing corners and broken edges of each wall surface, shall be repaired by the installer himself in time during construction before installation. After the completion of each wall, the on-site supervisor shall check and accept it, and then submit it to the project department for acceptance and packaging (if it is a processing error and cannot be repaired on site, the factory shall send professionals to repair it).
4.成品材料到場(chǎng)后,要按照?qǐng)D紙對(duì)照好墻面進(jìn)行安裝,對(duì)因安裝質(zhì)量不合格,圖紙尺寸于墻面不吻合引起返工,重新補(bǔ)板,造成材料損失,一切責(zé)任由乙方承擔(dān)(屬于工廠切割錯(cuò)誤的報(bào)到工廠做調(diào)換)。
4. After the finished materials arrive at the site, the wall shall be installed according to the drawings. Party B shall bear all the responsibilities for the rework caused by the unqualified installation quality and the inconsistent size of the drawings with the wall, and the material loss caused by the re patching of the plates (if the cutting is wrong in the factory, report to the factory for replacement).
以上就是為大家介紹的有關(guān)電梯不銹鋼門(mén)套的詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問(wèn)的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://www.kulg.cn
The above is a detailed introduction about the stainless steel door pocket of elevator. I hope it can help you If you have any questions, please contact us We will provide you with professional service http://www.kulg.cn
成人精品亚洲性爱| 日本ab在线播放| 蜜臀AV中文暖暖| 丁香五月就要操| 日韩无码理论视频| 伊人AV免费在线| 6688一级毛片| 97人人操超碰。| 中国成人高清无码| AV一区不卡免费| 97av亚洲国国产视频一区99| 久久特黄特黄大片| 国产一区欧美日韩在线观看| 日韩交配欧美交配| 欧洲亚洲另类视频在线观看| 最新加勒比东京热| 丁香五月欧美在线| 黄色播放器无码大片在线| 先锋影音在线资源| 91丝袜一区二区| 99热午夜草婷婷| 亚州A∨无码片中文字慕鲁丝片区| 亚洲人妻精品麻豆区| 偷拍高清五码不卡视频| 无码视频成人在线| 久久久人人人人人| 亚洲最大午夜剧场| 日本欧美日本在线| av高清性爱图片| 中国x站在线一区| 国产C级毛片二区| 91琪琪在线观看| www.国产se| 草久视频在线观看| 88va激情一下| 国产精选黄色视频| 亚洲老司机一区| 成人激情无码| 成年男女嗨嗨视频| 舒服一区三区视频| 欧美亚洲日韩久久|