亚洲人妻另类清纯_超碰在线观看永久_奇米网AV第四色_午夜AV影视大全_午夜AV影视大全_亚洲无码偷拍自拍_中文字幕一区二区三区熟女视频_日韩丝袜一区二区

濟(jì)南誠(chéng)耐金屬制品有限公司

濟(jì)南誠(chéng)耐金屬制品有限公司

不斷發(fā)展技術(shù)力量、完善的設(shè)計(jì)服務(wù)團(tuán)隊(duì),真誠(chéng)為您提供的服務(wù)

咨詢熱線
于經(jīng)理15194166167
15990909037

產(chǎn)品推薦

聯(lián)系我們

企業(yè)名稱:濟(jì)南誠(chéng)耐金屬制品有限公司

聯(lián)系人:于經(jīng)理

電話: 15990909037

電話: 15194166167

地址:山東省濟(jì)南市歷城區(qū)小清河南路8288號(hào)

當(dāng)前位置:首頁(yè) »資訊中心 » 新聞資訊

帶你了解上門安裝大理石電梯門步驟

來源:http://www.kulg.cn/ 瀏覽:0發(fā)表時(shí)間:2025-04-24

擔(dān)心的問題:安裝的時(shí)候不知道師傅的步驟是什么

Worried issue: I don't know what the master's steps are during installation

大理石電梯門套施上門安裝施工步驟:

Construction steps for installing marble elevator door frames:

1.石材挑選:用比色法對(duì)石材的顏色進(jìn)行挑選分類,安裝在同一面的石材顏色應(yīng)一致,按設(shè)計(jì)圖紙及分塊順序?qū)⑹木幪?hào)。

1. Stone selection: Use colorimetric method to select and classify the color of the stone. The color of the stone installed on the same side should be consistent, and the stone should be numbered according to the design drawings and block order.

2.墻面基層清理:清理墻面,裝好基層托架。,同時(shí)進(jìn)行結(jié)構(gòu)套方,找規(guī)矩,彈出垂直線和水平線。并根據(jù)設(shè)計(jì)圖紙和實(shí)際需要彈出安裝石材的位置線和分塊線。

2. Wall base cleaning: Clean the wall and install the base bracket., Simultaneously perform structural layout, find rules, and draw vertical and horizontal lines. And according to the design drawings and actual needs, mark the position lines and block lines for installing the stone.

3.打線:根據(jù)尺寸,打好施工線,石材安裝前要事先用經(jīng)緯儀打擊大角兩個(gè)面的豎向控制線,**好彈在離大角500px的位置上,以便隨時(shí)檢查垂直掛線的準(zhǔn)確線,保證順利安裝,并在控制線的上下作出標(biāo)記。

3. Marking: According to the size, mark the construction line. Before installing the stone, use a theodolite to strike the vertical control line on both sides of the large angle, and mark it at a distance of 500px from the large angle to check the accuracy of the vertical hanging line at any time and ensure smooth installation. Mark the top and bottom of the control line.

20220310105429537.jpg

4.安裝底層托架,把預(yù)先安排好的支托按上平線支在將要安裝的底層石板上面。支托要支承牢固,相互之間要連接好,也可和架子接在一起,支架安好后,順支托方向釘鋪通長(zhǎng)的50mm厚木板,木板上口要在同一個(gè)水平面上,以保證石材上下面處在同一水平面上。

4. Install the bottom bracket and support the pre arranged support bracket on the bottom stone slab to be installed according to the upper horizontal line. The support bracket should be firmly supported and connected to each other, and can also be connected to the frame. After the bracket is installed, a 50mm thick wooden board should be nailed along the direction of the support bracket. The upper opening of the wooden board should be on the same horizontal plane to ensure that the upper and lower surfaces of the stone are on the same horizontal plane.

5.安裝連接構(gòu)件:用設(shè)計(jì)規(guī)定的不銹鋼螺栓固定角鋼和平鋼板。調(diào)整平鋼板的位置,使平鋼板的小孔正好與石板的插入孔對(duì)上,固定平鋼板,用扳子擰緊。

5. Install connecting components: Use stainless steel bolts specified in the design to fix angle steel and flat steel plates. Adjust the position of the flat steel plate so that the small hole of the flat steel plate is exactly aligned with the insertion hole of the slate, fix the flat steel plate, and tighten it with a wrench.

6.大理石裝飾板材安裝:按照溝槽和構(gòu)件找好位置,便可把底層面板靠角上的一塊就位。

6. Installation of marble decorative panels: Find the position according to the groove and components, and then place the bottom panel at the corner.

7.板面微調(diào):安裝好大理石裝飾板材再調(diào)整水平度,如板面上口不平,可在板底的一端下口的連接平鋼板上墊一相應(yīng)的雙股銅絲墊。調(diào)整垂直度,并調(diào)整面板上口的不銹鋼連接件的距墻空隙,直至面板垂直。

7. Fine tuning of the board surface: After installing the marble decorative board, adjust the levelness. If the upper opening of the board surface is uneven, a corresponding double stranded copper wire pad can be placed on the connecting flat steel plate at the lower end of the board bottom. Adjust the verticality and adjust the gap between the stainless steel connector at the top of the panel and the wall until the panel is vertical.

8.頂部裝飾板材的安裝:頂部一層面板除了按一般石板安裝要求外,安裝調(diào)整好,在結(jié)構(gòu)與石板的縫隙里吊一通長(zhǎng)的20mm厚木條,木條上平為石板上口下去250mm,吊點(diǎn)可設(shè)在連接鐵件上。可用彩鋁絲吊木條,木條吊好后,即在石板與墻面之間的空隙里放填充物,且填塞嚴(yán)實(shí),防止灌漿時(shí)漏漿。

8. Installation of top decorative panels: In addition to following the general requirements for installing stone slabs, the top layer of panels should be installed and adjusted. A 20mm thick wooden strip should be hung in the gap between the structure and the stone slab, with the top of the strip being 250mm below the upper opening of the stone slab. The hanging point can be set on the connecting iron piece. Wooden strips can be hung with colored aluminum wire. After the wooden strips are hung, fill the gap between the stone slab and the wall tightly to prevent leakage during grouting.

本文由河北工地電梯門套上門安裝廠家友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://www.kulg.cn我們將會(huì)對(duì)您提出的疑問進(jìn)行詳細(xì)的解答,歡迎您登錄網(wǎng)站留言.

This article is a friendly contribution from the on-site installation manufacturer of elevator door frames at a construction site in Hebei For more information, please click: http://www.kulg.cn We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

激情高清无码自拍| 精品午夜www国产无码AV不卡| 成人我在入口一区| 丁香五月亚洲一区| wwww丁香五月| 婷婷五天月一av| 久碰久摸久看好男人视频| 欧美在线第53页| 熟女国产精品一区二| 滨海天气预报7天| 五月激情黄色视频| 中文字幕222页| 黄网花季丰满少妇| 国产一区欧洲一区| 亚洲无码内射网站| 精品人妻在线视频| 人妻97一区三区| 无码专区人妻糸列| 激情久久一二三区| 超碰国产人人在线| 91人妻.con| 深爱激情婷婷成人| 51精彩无码视频| 国产无高清无吗精品1中日| www.精品福利| 婷婷玖玖深爱网| 窝窝久色成人影院| 男操女视频亚洲一| 国产成人传媒电影免费看| av在线直播天堂| 亚洲AⅤ无码专区| 国产精品日韩AV| 亚洲天堂无码视频| 国产精品美女久久久| 久久综合精品色图| av8在线观看| 韩日欧美裸体网站| 日本三区久草视频| 国内精品亚洲综合中文字幕伊人图区| 99青草综合| 综合国产精品合集|